The NK-Teplokhimmontazh holding began lifting the purification unit of the Prilling Tower No. 3 at PJSC Togliattiazot.
Lifting is carried out using six 400 tonne jacks.
The weight of the structure is 1000 tons, the lifting height is 97 meters above ground level.