Chusovskoy Metallurgical Plant, 2021
Chusovskoy Metallurgical Plant JSC, 2021 Delivery of chimney and gas duct, refractory lining.
Chusovskoy Metallurgical Plant JSC, 2021 Delivery of chimney and gas duct, refractory lining.
Sorry, this entry is only available in Russian.
Sorry, this entry is only available in Russian.
Sorry, this entry is only available in Russian.
Sorry, this entry is only available in Russian.
(Русский) Компания является российским производителям печей с газовым нагревом серии ТХМ.
Также холдинг состоит в реестре российской промышленной продукции в МинПромТорге России.
The NK-Teplokhimmontazh holding began lifting the purification unit of the Prilling Tower No. 3 at PJSC Togliattiazot. Lifting is carried out using six 400 tonne jacks. The weight of the structure is 1000 tons, the lifting height is 97 meters above ground level.
Sorry, this entry is only available in Russian.
Sorry, this entry is only available in Russian.
Sorry, this entry is only available in Russian.
Sorry, this entry is only available in Russian.
Sorry, this entry is only available in Russian.
Sorry, this entry is only available in Russian.
Sorry, this entry is only available in Russian.
Sorry, this entry is only available in Russian.
On November 27, 2020, ZAO PKF NK together with Belgorod State National Research University won an open competition for the right to receive subsidies from the federal budget for development cooperation of Russian educational institutions of higher education, state scientific institutions and organizations of the real sector of the economy in order to implement complex projects for the creation of high-tech industries.
Vladislav Igorevich Kuzin has been appointed to the position of the Managing Director of the NK-Teplokhimmontazh holding from September 1, 2020. Vladislav’s career began in the holding in 2014 as the head of PKF NK, a manufacturing company that produces refractory materials. The task of the Managing Director is to develop new areas of activity: Read more about Vladislav Kuzin has been appointed to the position of the Managing Director of the NK-Teplokhimmontazh holding[…]
Sorry, this entry is only available in Russian.
JSC “Teplokhimontazh” with its own forces is building a dry dock No.1, No.2 and a bund No. 1 at the construction site: “The center for the construction of large-tonnage offshore structures (CSKMS). Complex for making gravity based structures and integration of topside modules”. Belokamenka rural locality, Murmansk region. Customer: NOVATEK-Murmansk.
Sorry, this entry is only available in Russian.
Sorry, this entry is only available in Russian.
Sorry, this entry is only available in Russian.
NK-Teplohimmontazh Holding has completed the construction works of an isothermal LNG storage tank with a volume of 42,000 m3 in the port of Vysotsk.
Specialists of the “NK-Teplokhimmontazh” Holding has completed a full cycle of works on the construction of a silo for bulk storage of sugar, including: pile driving in the amount of 1712 pieces; concreting the foundation 2100m 3; building walls of silage and operating tower 2950m3; installation of metal structures of the dome and roof; lifting Read more about The construction of a silo for bulk storage of sugar with a capacity of 60,000 tons has been completed[…]
Sorry, this entry is only available in Russian.
Sorry, this entry is only available in Russian.
Sorry, this entry is only available in Russian.